Aerial view of the Townsville Connection Road intersection upgrade
Civil Construction Support

Built right,
before ground breaks.

Construction staging and methodology, estimating, quantity take-offs and temporary traffic management design — support from tender stage right through to delivery. We link designers, engineers and on-site contractors so civil infrastructure projects are planned correctly from the onset.

Scroll
About Us

Constructability, built in from tender to delivery.

25+
Years senior design experience
27+
Years engineering experience
10+
Years TMD certified
30+
Major QLD infrastructure projects supported

We pair experienced Civil Construction Engineers with Civil Design Experts to support civil infrastructure projects from tender stage right through completion — construction staging and methodology, estimating, quantity take-offs and temporary traffic management design — all prepared to meet industry regulations and standards while respecting the fluid, confined reality of live construction work zones.

Across every package, our approach prioritises constructability, linking designers, engineers and on-site contractors so projects are planned correctly from the onset. The result is safer work zones, minimal disruption to traffic flow, improved vulnerable road user safety and optimised construction activity.

What we do

Multiple disciplines, one integrated package.

Engage any area on its own, or combine them into one coordinated package — delivered by a single team, with no handover gaps between disciplines.

01

Civil Engineering

Design solutions grounded in constructability — road, pavement, drainage and temporary barrier design developed alongside the team building it.

  • Temporary Works Design
  • Side-track Design
  • Temporary Barrier Design
  • Road Design
  • Pavement Design
  • Drainage Design
  • PUP 3D Space Proofing
02
1 2 3

Construction Staging

From tender to delivery — methodology, programmes and stage quantities that win work and survive contact with site.

  • Tender Staging and Methodology
  • Constructability Reviews
  • Construction Programmes (P6 Primavera)
  • Construction Staging
  • Staged Quantity Take-offs
  • Roadside Risk Assessment
  • Work Area Access Points
  • Vehicle Management Plans
03

Traffic Engineering

RPEQ-certified designs, modelling and analysis — built around safe, intuitive driver journeys through every stage of works.

  • TMD & RPEQ Certified Designs
  • Traffic Staging Plans
  • Long-term Traffic Guidance Schemes
  • Swept Path Analysis
  • Traffic Analysis & Modelling (SIDRA)
  • RPEQ Review & TGS Sign-offTry our ClearWay Portal →
04

Civil Infrastructure Delivery

Hands-on support through construction — keeping projects moving, compliant and accountable from site to client.

  • Project Management
  • Estimating
  • RPEQ Inspections
  • Client-Side Project Management
Our Approach

A systematic process, with quality at the forefront.

ConciseCiv is ISO 9001 certified, and that quality-first mindset runs through every project we touch. No two jobs are the same, but our approach is consistent — a disciplined, repeatable process that keeps work moving, decisions documented, and communication open and honest from start to finish.

CERTIFii International — ISO 9001 Quality Management certification mark JAS-ANZ accreditation symbol

ConciseCiv Consulting Pty Ltd (ABN 62 647 312 365) operates a Quality Management System certified to ISO 9001, issued by CERTIFii International.

01

Understand the project

We get across the scope, constraints, programme and how the job needs to be built — so the brief is clear and shared from day one.

02

Review the options

We interrogate methodology, staging and design options to find the most constructible, cost-effective path forward.

03

Develop & manage risk

We develop the solution from concept to detail, identifying, recording and managing risk at every step.

04

Coordinate & check

We bring together designers, engineers and specialist partners, with independent review to assure quality before anything is issued.

05

Deliver & support

Quality-assured packages are issued to standard — backed by hands-on support through construction to completion.

Design to Reality

From Paper to Production

Two projects, stage by stage. Choose a project below, step through its transformation, and drag the slider to compare our temporary traffic management design against the works as they were built.

Project aerial

Please note: some aerials were captured during an implementation phase and may not align exactly with the TTM design.

Project aerial

Please note: some aerials were captured during an implementation phase and may not align exactly with the TTM design.

Behind the Build

Estimating, methodology & quantity take-offs

Before a truck turns a wheel, we quantify the job. Construction methodology, earthworks and material take-offs, and detailed bills of quantities underpin every tender and delivery programme we support — turning a design into a costed, buildable plan.

Earthworks take-off markup over an aerial corridor
Earthworks Take-offs
Material take-off with trench profile over an aerial
Material Take-offs
3D earthworks visualisation of a work area access point
3D Visuals
Detailed tender estimate and bill of quantities
Full Tender Estimates
Construction programme Gantt chart
Construction Programmes
Our Experience

Feature Projects Across Queensland

Major motorway upgrades, intersection improvements, regional highway works — delivered with TMR, Transurban, Brisbane City Council, Gold Coast City Council and Tier 1 contractors. Click any project to read more.

Coomera Connector (Stage 1) Central
Gold Coast · TMR View details →

Coomera Connector (Stage 1) Central

Bruce Highway, Dohles Rocks Road to Anzac Avenue upgrade
Moreton Bay · TMR View details →

Bruce Highway (Brisbane–Gympie), Dohles Rocks Rd to Anzac Ave

Townsville Connection Road (Stuart Drive), University Road to Bowen Road Bridge
Townsville · TMR View details →

Townsville Connection Rd (Stuart Dr) — University Rd to Bowen Rd Bridge

Caboolture–Bribie Island Road, Old Toorbul Point Road to Saint Road
Caboolture · TMR View details →

Caboolture–Bribie Island Rd — Old Toorbul Point Rd to Saint Rd

Further projects

  • Gemini Mine Access, DingoTTM Design
  • Brisbane Terrace Upgrade, GoodnaRPEQ Risk Assessments
  • Victoria Park Olympic Stadium EarthworksTemporary Works Designs (Tender)
  • Bruce Highway, Ayr to TownsvilleTender Support
  • Linkfield Road Overpass UpgradeEOI Support
  • Caloundra Transport Corridor UpgradeFull Tender Package
  • Mooloolah River Interchange Early WorksTender Support
  • McGarry Road UpgradeTTM Design
  • Pumicestone Road Intersection UpgradeTTM Design
  • Logan Motorway EastboundTTM Design
  • Bruce Highway, Ingham–InnisfailConstruction Program & Methodology
  • Bruce Highway Upgrade, GunaldaTTM Design
  • Gillies Range Road Slope StabilisationLong-Term Traffic Guidance Schemes
  • Beerburrum–Cooroy Street Upgrade, Dicky BeachTender Support
  • Landslide Remediation, Buderim Tramway TrailFull Tender Package
  • Port of Brisbane RehabilitationTender Support
  • Port North Intersection UpgradeRoadside Risk Assessments
  • Pavement Stabilisation, Richlands & LarapintaFull Tender Package
  • Cunningham Highway Upgrades, Warwick to InglewoodTTM Design
  • D'Aguilar Highway Pavement Rehabilitation (Bracalaba)Project Manager
  • David Low Way Retaining Wall ReplacementTTM Design
  • Emergency & Disaster RecoveryEmergency TGS
  • Transurban Guardrail WorksDetailed Design
  • Maleny Stanley River RoadTender Support
  • Papua New Guinea SubdivisionPreliminary Design
  • Warrego Highway Side TrackDetailed Design
  • Glass House Mountains RoadTTM Design
  • Glass House Mountains RoadTender Support
  • Paradise Dam Package 3TTM Design
  • Sunwater Degilbo BridgeTender Support
  • Yandina Coolum Road & School Road Intersection UpgradeTTM Design
  • Cairns Southern Access CyclewayFull Tender Package
  • Samford Road & Camp Mountain Road IntersectionTTM Design
  • Mount Cotton QuarryExternal Roadworks Superintendent
  • Mount Cotton QuarryInternal Haul Road Designs
  • Stringybark Road Pedestrian and Cycle BridgeTender Support
  • Pacific Motorway: Eight Mile Plains to Daisy HillTemporary alignment design
  • Loganlea Rd Overpass Bridge Deck ReplacementWork Area Access Point design
  • Cunningham Hwy — Lake Moogerah IntersectionTTM Design
  • Strathpine — Samford Rd safety route14km widening
  • Flinders Highway (Julia Creek – Cloncurry)Floodway works
  • Cairns Southern Access Corridor (Stage 3)SISD review
  • Bruce Highway / Booyal Dallarnil Rd IntersectionTTM Design
  • Townsville Ring Road Stage 5Temporary Traffic Management
  • Rockhampton-Yeppoon RoadTemporary Traffic Management
  • O'Keefe Street VelowayVulnerable Road User
  • Bruce Highway Upgrade, Emu Creek to Drays RoadTTM Design
Our People

A small team. Decades of hands-on experience.

A small, hands-on team. Our directors lead every project personally, backed by senior engineers and support staff who see the work through from planning to completion.

Wade Davey

Wade Davey

Director · Principal Civil Engineer

RPEQ Certified Civil Engineer and qualified Traffic Management Designer with 15+ years experience. Extensive knowledge across planning, staging and delivery of major transport infrastructure for TMR, Brisbane City Council and other local government agencies.

Tristan Reyne

Tristan Reyne

Director · Principal Civil Designer

25+ years experience in civil technical consulting with a focus on road infrastructure design and documentation. Expert user of Civil3D, Infraworks, 12D Model and AutoCAD, with deep appreciation for the complexities of practical, constructible design.

Callum James

Callum James

Senior Civil Engineer

Senior civil engineer with a strong focus on constructable, standards-compliant design. Callum leads detailed engineering across road, drainage and temporary works, bringing RPEQ-certified rigour to every package.

Andy Dahl

Andy Dahl

Senior Civil Designer

17 years experience across horizontal and vertical geometry, road and intersection design, and temporary traffic management using 12d, AutoCAD, Civil 3D, MicroStation and Open Roads. Deeply knowledgeable across the TMR design manuals and Australian Standards.

Kirstine Davey

Kirstine Davey

Administration Support

Kirstine keeps the business running behind the scenes — coordinating administration so the team stays focused on delivering quality work.

Our Reputation

What our clients say.

Wade's traffic-related expertise and commitment as the Nominated Traffic Officer on the Pacific Motorway Upgrade were instrumental in ensuring minimal disruption to the daily flow of over 150,000 vehicles. His innovative traffic staging and design solutions optimised construction efficiency.

— Drive Engineering

ConciseCiv completed a comprehensive engineering risk assessment report for excavation works beside a confined major arterial road. Wade and his team efficiently delivered a report that exceeded contractor and road owner expectations.

— Bielby Holdings

The design work met the requirements of relevant design standards, MRTS02.1 and expectations of the client — and considered critical constructability elements and traffic modelling innovations at the time of tender.

— North Queensland Project Partners

ConciseCiv have provided prompt and professional services with particular emphasis on detailed planning and staging proposals. They have always provided high-quality proposals and engineered solutions — and their services are highly recommended.

— FKG Group

ConciseCiv's temporary traffic management for the Yandina–Coolum Road Intersection Upgrade was practical, clear and well-suited to the project. Their long-term traffic guidance schemes stayed in place for eight months with no traffic-related incidents — a real reflection of the design's reliability. Koppen would use and recommend ConciseCiv again for future projects.

— Koppen

Since August 2023, working alongside the Fulton Hogan, JF Hull & McIlwain Joint Venture (FHHMJV) on the Coomera Connector Central Package, CCV have demonstrated a high standard of expertise and professionalism. Their TTM designs have undergone thorough reviews by the Contractor, independent reviewers, and the Department of Main Roads, meeting stringent project requirements and achieving strong outcomes. FHHMJV is pleased with CCV's work and would readily recommend their services to others.

— Fulton Hogan, JF Hull & McIlwain Joint Venture

ConciseCiv consistently delivers reliable temporary traffic management. The drawings are clear and practical, the long-term guidance schemes suit extended construction, and touches like signage coordinates make on-site setup simple. Their compliance audits show a proactive commitment to safety — a helpful, professional partner.

— Hazell Bros

ConciseCiv designed the temporary traffic management to detour the Warrego Highway — a national freight route — for the reconstruction of a full-width multicell culvert. The fit-for-purpose design report and traffic assessment were approved by the Department of Transport and Main Roads, and the plan was clear, concise and in line with industry best practice. Our onsite crews and traffic implementers found it easily implementable and well-suited to the type and duration of works.

— Civil Mining & Construction Pty Ltd
Get in touch

Got a project on the horizon?

We'd be glad to talk through the staging, risks and design opportunities — whether it's a quick chat or a full scoping conversation.

Wade Davey
0466 812 545Director · Principal Civil Engineer
Tristan Reyne
0439 846 905Director · Principal Civil Designer
ABN
62 647 312 365

Send us a project enquiry

Fill out the form and one of our directors will get back to you as soon as possible.